Estimating building construction costs: analysis of the processbased budget model (POP Model)

Authors

  • R. Falcón Universidad de Sevilla (España)
  • M. Victoria Montes Delgado Universidad de Sevilla (España)
  • A. Ramírez Universidad de Sevilla (España)

DOI:

https://doi.org/10.4067/S0718-50732016000100002

Keywords:

budget model, economic efficiency in construction

Abstract

The recent economic crisis suffered by the Spanish construction sector has brought to light its excessive vulnerability to fluctuations in the real estate market. Overcoming this situation requires to innovate the sector in order to increase its efficiency. A large amount of researches in Spain focus on the improvement of the environmental efficiency of construction works, but only a few of them deal with its economic efficiency. The current study arises from the importance of the latter in order to achieve a comprehensive sustainability in construction. We introduce a process-based budget model, the POP model, whose most significant strength is the direct inclusion of all costs incurred at the building production site. In this way, process-based estimates expose with transparence and accuracy the real nature of the projected works, contributing to improve their economic management.

Author Biographies

R. Falcón, Universidad de Sevilla (España)

Departamento de Matemática Aplicada I Profesor Contratado Doctor Interino

M. Victoria Montes Delgado, Universidad de Sevilla (España)

Departamento de Construcciones Arquitectónicas II Profesor Ayudante Doctor

A. Ramírez, Universidad de Sevilla (España)

Departamento de Construcciones Arquitectónicas II

Published

2020-07-01

How to Cite

Falcón, R., Montes Delgado, M. V., & Ramírez, A. (2020). Estimating building construction costs: analysis of the processbased budget model (POP Model). Revista Ingeniería De Construcción, 31(1), 17–25. https://doi.org/10.4067/S0718-50732016000100002

Issue

Section

Original Research

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.